Fan Coil Installation (Johor and Selangor)

Scope of Work:

  • Site Assessment & Planning
    Evaluate room layout, load requirements, and ducting paths to determine optimal FCU placement and sizing.

  • FCU Supply & Delivery
    Provide wall-mounted, ceiling cassette, or concealed-type FCUs from trusted brands based on project needs.

  • Mounting & Structural Works
    Secure installation of FCU brackets, supports, and vibration isolators to ensure safe and stable operation.

  • Piping & Drainage Installation
    Install insulated chilled water or refrigerant piping and properly sloped condensate drain lines to prevent leaks.

  • Electrical Wiring & Control Connection
    Complete electrical wiring, control panel setup, and integration with thermostats or building management systems (BMS).

  • Air Duct & Diffuser Connection (if required)
    Install flexible or rigid ducts and connect to supply and return air diffusers for efficient airflow distribution.

  • Pressure Testing & Insulation
    Conduct leak and pressure tests on piping systems and apply insulation to prevent energy loss and condensation.

  • System Testing & Commissioning
    Perform startup procedures, airflow measurement, temperature testing, and calibration of controls.

  • Handover & User Training
    Provide operation manuals, warranty documents, and training for facility staff on basic use and maintenance.

Make Appointment

We would be more than happy to solve your problem and question, please arrange your appointment with us.