Photo Album

13  

Detail Steam and Chemical Cleaning of AHU at 5 Star Hotel

14  

Servicing Split Units at Paragon@CIQ

3  

Forest City Golf Club Servicing of VRF Units

7  

Troubleshooting motorised valve at DoubleTree today

11  

Servicing Water Cooled Package Units today at BMW JB

7  

Rectifying water leak and reinstall chilled water works and insulation at DoubleTree Hotel

9  

Changing FCU motor at Amari Hotel

5  

Preventive Chiller Servicing by KCK Team

9  

Refrigerant leak test and refill of refrigerant

5  

Experience airflow improvements with KCK Steam and Chemical cleaning for AHU and FCU, real life reports shared.

3  

Cooling Tower Belting Replacement Works in Johor

15  

Late night Fan Coil Unit Steam Cleaning and Preventive Maintenance at Doubletree Hilton Hotel

6  

Ramada Hotel Chemical Cleaning for DX Units

1  

Sample KCK-SS FCU Service Report for a Free Steam Mock up for our new Client's

6  

Chilled Water Pipe Installation and Insulation Works at Holiday Villa Johor

5  

AHU Filter Supply and Change in Johor

5  

Steam and Chemical Cleaning Works at Multiple Locations

4  

VRV Installation at Dyson Site Tuas

19  

Residential Airconditioning Maintenance and Installation Works

15  

Cooling Tower Maintenance and Washing Works (Multiple Sites)

7  

Heat Recovery / Heat Pump Retrofit and Maintenance Works - Singapore

16  

HVAC Retrofit Works at 5 Star Hotel (Le Meridien & DoubleTree Hilton)

11  

HVAC Servicing and Retrofit - Industrial Site in Tuas Singapore

10  

HVAC Servicing - Hotel and Office Buildings Across Johor and KL

6  

HVAC Maintenance at Manufacturing Facility in Johor

1  

Others